← Back to Playbook

Cybersecurity Change Request (CR)

In accordance with IACS UR E26 §5.3.1 – Management of Change

Doc ID: TAG-MOC-2026
Version: 1.2

1. GENERAL INFORMATION

Vessel Name: Date:
Requestor / Rank: Priority: [ ] Low [ ] Med [ ] High

2. CHANGE DESCRIPTION & JUSTIFICATION

Briefly describe the hardware/software modification (e.g., Firmware update for Moxa Switch, PLC replacement in Engine Room).

3. SYSTEM IMPACT & RISK ASSESSMENT

IACS Category: [ ] Cat I [ ] Cat II [ ] Cat III
Connection: [ ] Serial / NMEA [ ] Ethernet / OT [ ] Remote Access

4. POST-CHANGE VERIFICATION

  • [ ] MAC Address / Serial Number updated in Master Asset Inventory?
  • [ ] System functional test performed and witnessed?
  • [ ] Unused services/ports disabled on new hardware?
  • [ ] Configuration backup successfully stored?

Authorized by (CCSO / Master):

Signature & Date

Technical Verification (ETO / SI):

Signature & Date

Scroll to Top